+86-20-86847851 / +86-20-36873666

Service Hotline:

Back to top

COPYRIGHT©2018 WINNER STAINLESS STEEL TUBE CO.,LTDAll Rights Reserved.   粤ICP备10012090号   Powered By:300.cn

Domestic pipe: +86-20-86847851
Fax: +86-20-86847856
E-MAIL: [email protected]
Export pipe: +86-20-36873666
Fax: +86-20-36873669
E-MAIL:[email protected]

 

2005~2008年

2009~2011年

>
Group history

Group history

1993

1994

1995

1996

1997

Purchase the first phase of the factory land 1 6000 square meters

Founded on July 4th
The first phase of the plant is completed, with an annual production capacity of approximately 4,800 metric tons.

The second phase of the plant and embossing pipe plant project completed
Add slitting machine and embossing tube equipment

The third phase of the plant is completed
Expanded production line equipment annual production increased to 14,400 metric tons

Purchased the fourth phase of the factory land 14,000 square meters

1998

1999

The completion of the fourth phase of the finished product warehouse project
Expanded production capacity of 24,000 metric tons per year

The fifth phase of modern office building project, the inspection room project completed
Implemented IS09001 quality management system and obtained German TUV certification in December
The wool surface stainless steel tube was successfully developed and started to be marketed.
Capital increase of $9.6 million
Purchase 15,000 square feet of the fifth phase of the factory site

Completion of the sixth phase of the plant
Add industrial piping production line with an annual production capacity of 35,000 metric tons
Food hygiene stainless steel pipe was successfully developed and put into operation smoothly
Capital increase of $15.6 million
Obtained the German RWTUV IS014001 Environmental Management System Certification

2000

2001

Received the quality certification of ISO12770 and GB/T 12771 quality management system of China Fangyuan Committee

Won the Guangzhou High-tech Enterprise

Purchased 66. 666 square meters of land for the new factory and established Yongsheng Steel Company

2002

2006

Guangzhou Yongsheng Steel Products Co., Ltd. officially put into operation

Capital increase of $29.8 million

Obtained the hygiene permit for drinking water hygiene and safety products in Guangdong Province

2008

Guangzhou Yongda Stainless Steel Co., Ltd. passed the evaluation of the enterprise safety royal body assessment by the Guangzhou Municipal Administration of Work Safety

2009

Established "Yongda Stainless Steel Group" in April 2009

2009-8-12 φ630mm forming unit, the largest domestic diameter forming machine test

In December 2009, it won the national high-tech enterprise

Guangzhou Yongsheng Steel Products Co., Ltd. officially put into operation

Obtained the qualification of the national special equipment A grade (pressure pipeline) manufacturing license